Propane Cabinet Relocation

Propane Cabinet Relocation

A facilities improvement modification was performed to re-locate an existing propane cabinet and its pipework.

Temporary Pig Launcher

Temporary Pig Launcher

Feasibility study performed to assess the preliminary engineering scope for the installation of a temporary pig launcher for the in-line inspection of the Clyde.

Reverse Osmosis Plant

Reverse Osmosis Plant

The FPSO Petrojarl BANFF currently has two Fresh Water (FW) units which do not produce enough drinking water to meet daily consumption.

Cooler Installation

Cooler Installation

Concept study to evaluate the installation of an additional cooler on the FPSO Petrojarl BANFF, required to avoid production shutdowns during maintenance of the in-service cooler.

Use of Hand Held Scanner

Use of Hand Held Scanner

Step Change Engineering (SCE) has applied recent advances in technology to develop a low cost, fully integrated 3D scanner.